แกแแแขแแฅแแแแ, แแแแแแแ
Negotiable priceแแแแ แแฃแแ แกแแฎแแแแแก, แแแแ แแแแแแก แแฆแแแแแ, แ แแแแแกแขแ แฃแฅแชแแ แแแแแแขแแแ
Negotiable priceแแแแแ แแแ,แแแแแแขแแแ
Negotiable priceTips Before Starting Demolition Works
Identifying load-bearing structures: Before tearing down any wall or partition, always check the architectural plan of the apartment. Demolishing load-bearing (structural) walls, beams, and columns is strictly prohibited, as it compromises the stability of the entire building. Disconnecting utilities: Before starting any work, thoroughly turn off and shut down all engineering utilities: electricity, water, and gas. Accidental damage to a pipe or an old cable during demolition can lead to disastrous consequences. Warning the neighbors: Demolition is the loudest and dustiest phase of renovation. Inform your neighbors in advance and carry out the work only during legally permitted hours to avoid conflicts and fines. Construction waste removal: Agree with the workers in advance whether bagging the debris, carrying it downstairs, and hauling it away via a dedicated dump truck (to an official construction landfill) is included in the price. Dumping construction waste into regular household trash bins is prohibited. Protecting the elevator and hallway: To prevent damage to the common hallway and elevator while hauling materials down, prep and wrap the elevator walls and floors in advance using cardboard boxes or protective plastic sheeting. ๐ก Trust the professionals: Find experienced crews for wall demolition and old renovation stripping, equipped with their own specialized tools and waste removal services on the platform: services.ss.ge
แ แแแแ-แแแขแแแแก แแฃแ แฆแแ
Negotiable priceแแแขแแแแก แชแแแแแแแ
Negotiable priceแแแ แคแแ แแขแแ แแ แแแแแ แแแ
Negotiable priceแแแแแแก แฌแงแแแ แแ แแแกแแ
Negotiable priceแกแแงแแคแแชแฎแแแ แแแ แแแ แฉแแแแแแก แแแขแแแ
Negotiable priceแแแแแแขแแแแก แกแแ แแแกแแแ
Negotiable priceแแแแแแขแแแแก แกแแ แแแกแแแ
50 โพแแแแแแงแแแแแแแแแก แแแแขแแแ, แแ แแแฅแขแแ แแแ.
Negotiable priceแกแ แฃแแ แกแแ แแแแแขแ แแแแกแแฎแฃแ แแแ
Negotiable priceแแแแแแขแแแแก แกแแแฃแจแแแแแ
Negotiable priceFrequently Asked Questions - Dismantling Work
If you are demolishing a non-load-bearing partition wall, a permit is not required. However, if you plan to make minor modifications to a load-bearing structure, cut out a new door opening within boundaries, or alter the facade (e.g., enclosing a balcony), it is mandatory to obtain an official Class I work permit from the City Hall Architectural Service.
Complete dismantling (so-called stripping down to the black frame) includes: removing old wallpaper and plaster, laying tiles and laminate/parquet, dismantling old doors, windows and plumbing pipes, as well as removing unnecessary partitions.
The price depends on the volume and complexity of the work. Wall demolition is typically calculated per square meter (taking into account wall thickness and material โ block, brick, or concrete). Conversely, stripping old flooring, tiles, or old plaster layer is often priced as a flat fee (fixed price) for the entire scope of work.