Apartment, house renovation service
27 Application
demontaji
More than 5 years
24/7
Tbilisi

დემონტაჟის სერვისები

50 ₾
More than 5 years
24/7
Tbilisi
demontajiverifiedTbilisi

Tips Before Starting Demolition Works

1

Identifying load-bearing structures

Before tearing down any wall or partition, always check the architectural plan of the apartment. Demolishing load-bearing (structural) walls, beams, and columns is strictly prohibited, as it compromises the stability of the entire building.

2

Disconnecting utilities

Before starting any work, thoroughly turn off and shut down all engineering utilities: electricity, water, and gas. Accidental damage to a pipe or an old cable during demolition can lead to disastrous consequences.

3

Warning the neighbors

Demolition is the loudest and dustiest phase of renovation. Inform your neighbors in advance and carry out the work only during legally permitted hours to avoid conflicts and fines.

4

Construction waste removal

Agree with the workers in advance whether bagging the debris, carrying it downstairs, and hauling it away via a dedicated dump truck (to an official construction landfill) is included in the price. Dumping construction waste into regular household trash bins is prohibited.

5

Protecting the elevator and hallway

To prevent damage to the common hallway and elevator while hauling materials down, prep and wrap the elevator walls and floors in advance using cardboard boxes or protective plastic sheeting.

💡

Trust the professionals

Find experienced crews for wall demolition and old renovation stripping, equipped with their own specialized tools and waste removal services on the platform: services.ss.ge

Frequently Asked Questions - Dismantling Work

If you are demolishing a non-load-bearing partition wall, a permit is not required. However, if you plan to make minor modifications to a load-bearing structure, cut out a new door opening within boundaries, or alter the facade (e.g., enclosing a balcony), it is mandatory to obtain an official Class I work permit from the City Hall Architectural Service.

Complete dismantling (so-called stripping down to the black frame) includes: removing old wallpaper and plaster, laying tiles and laminate/parquet, dismantling old doors, windows and plumbing pipes, as well as removing unnecessary partitions.

The price depends on the volume and complexity of the work. Wall demolition is typically calculated per square meter (taking into account wall thickness and material — block, brick, or concrete). Conversely, stripping old flooring, tiles, or old plaster layer is often priced as a flat fee (fixed price) for the entire scope of work.