Construction works service
9 Application
แƒฉแƒ”แƒ›แƒ˜ แƒกแƒแƒฎแƒšแƒ˜แƒฉแƒ”แƒ›แƒ˜ แƒกแƒแƒฎแƒšแƒ˜แƒฉแƒ”แƒ›แƒ˜ แƒกแƒแƒฎแƒšแƒ˜
More than 5 years
24/7
Tbilisi

แƒแƒ’แƒแƒ แƒแƒ™แƒ”แƒ‘แƒ˜แƒก แƒจแƒ”แƒ แƒฉแƒ”แƒ•แƒ แƒžแƒ แƒแƒ”แƒฅแƒขแƒ˜แƒ แƒ”แƒ‘แƒ,แƒ›แƒจแƒ”แƒœแƒ”แƒ‘แƒšแƒแƒ‘แƒ, แƒจแƒ”แƒ›แƒแƒฆแƒแƒ‘แƒ•แƒ

Negotiable price
More than 5 years
24/7
Tbilisi
แƒฉแƒ”แƒ›แƒ˜ แƒกแƒแƒฎแƒšแƒ˜verifiedTbilisi
Electrician Electrician Electrician
More than 5 years
24/7
Tbilisi

แƒ’แƒ•แƒ˜แƒ แƒแƒ‘แƒ”แƒ‘แƒ˜แƒก แƒ’แƒแƒงแƒ•แƒแƒœแƒ

Negotiable price
More than 5 years
24/7
Tbilisi
Electrician verifiedTbilisi
PaataPaataPaata
More than 5 years
Working days
Tbilisi

แƒฎแƒ˜แƒ›แƒ˜แƒœแƒฏแƒ”แƒ‘แƒ˜แƒก แƒ›แƒแƒฌแƒงแƒแƒ‘แƒ, แƒ‘แƒฃแƒ แƒฆแƒ•แƒ˜แƒ—แƒ˜ แƒกแƒแƒ›แƒฃแƒจแƒแƒแƒ”แƒ‘แƒ˜

Negotiable price
More than 5 years
Working days
Tbilisi
PaataverifiedTbilisi

๐Ÿšœ 5 Golden Rules Before Starting Drilling and Earthmoving Works

Detecting hidden utilities: Before beginning any excavation or drilling, it is absolutely critical to check the mapping of underground utilities (high-voltage cables, gas pipelines, water mains, and fiber-optic internet cables) on the territory. Damaging them leads to severe financial fines and is highly life-threatening. Soil type and machinery selection: Soil structure determines the type of heavy machinery required. For soft, sandy, or clay soils, standard excavators and hydraulic augers are sufficient. However, for working through rocky and solid formations, the use of a hydraulic breaker (commonly known as a rockbreaker) or diamond core drills is mandatory. Proper water well design: When drilling a water well (borehole) for drinking or irrigation purposes, a geological survey is essential to precisely determine the depth of the aquifer. During installation, using high-quality casing pipes (with piezometric filters) is vital to ensure the water flows clean, free of sand and silt. Slope stabilization (landslide prevention): When cutting deep foundations, trenches, or ditches (especially in damp soil), there is a constant risk of soil collapse. For works deeper than 1.5 meters, it is mandatory to use protective shoring (trench shields/sheet piles) or to maintain a safe slope inclination angle. Soil balance and excess earth removal: During earthworks, excavated soil loosens and its volume expands by nearly 20% to 30%. Plan in advance what portion of the excavated earth will be needed for backfilling and site grading (leveling), and what volume of soil will need to be hauled away by dump trucks to designated suburban dumping sites. ๐Ÿ’ก Trust earthmoving professionals: Find water well drilling specialists, heavy excavator, Bobcat, and mini-drill operators, as well as foundation excavation crews at the best prices on the platform: services.ss.ge

แƒšแƒ”แƒ•แƒแƒœแƒ˜
More than 5 years
24/7
Tbilisi

แƒ‘แƒ”แƒขแƒแƒœแƒ˜แƒก แƒญแƒ แƒ แƒ“แƒ แƒ‘แƒฃแƒ แƒฆแƒ•แƒ แƒžแƒ แƒแƒคแƒ”แƒกแƒ˜แƒแƒœแƒแƒšแƒฃแƒ แƒแƒ“

Negotiable price
More than 5 years
24/7
Tbilisi
แƒšแƒ”แƒ•แƒแƒœแƒ˜verifiedTbilisi
goga
More than 5 years
24/7
Tbilisi

แƒฌแƒงแƒšแƒ˜แƒก แƒ‘แƒฃแƒ แƒฆแƒ•แƒ / แƒแƒ แƒขแƒ”แƒ–แƒ˜แƒฃแƒšแƒ˜ แƒญแƒแƒ‘แƒฃแƒ แƒฆแƒ˜แƒšแƒ˜

200 โ‚พ
More than 5 years
24/7
Tbilisi
gogaverifiedTbilisi
Electrician Electrician Electrician
More than 5 years
24/7
Tbilisi

แƒ›แƒ˜แƒฌแƒ˜แƒก แƒกแƒแƒ›แƒฃแƒจแƒแƒแƒ”แƒ‘แƒ˜ โ€ข แƒ“แƒ”แƒ›แƒแƒœแƒขแƒแƒŸแƒ˜ โ€ข แƒฎแƒ˜แƒ›แƒ˜แƒœแƒฏแƒ˜ โ€ข แƒ’แƒ•แƒ˜แƒ แƒแƒ‘แƒ˜

Negotiable price
More than 5 years
24/7
Tbilisi
Electrician verifiedTbilisi, Mesame masivi
More than 5 years
24/7
Tbilisi

แƒ’แƒ”แƒแƒ“แƒ”แƒ–แƒ˜แƒ

Negotiable price
More than 5 years
24/7
Tbilisi
romaTbilisi
แƒ’แƒ˜แƒแƒ แƒ’แƒ˜ แƒแƒšแƒ‘แƒแƒ แƒแƒจแƒ•แƒ˜แƒšแƒ˜แƒ’แƒ˜แƒแƒ แƒ’แƒ˜ แƒแƒšแƒ‘แƒแƒ แƒแƒจแƒ•แƒ˜แƒšแƒ˜แƒ’แƒ˜แƒแƒ แƒ’แƒ˜ แƒแƒšแƒ‘แƒแƒ แƒแƒจแƒ•แƒ˜แƒšแƒ˜
More than 5 years
24/7
Tbilisi

แƒกแƒแƒ›แƒจแƒ”แƒœแƒ”แƒ‘แƒšแƒ แƒขแƒ”แƒฅแƒœแƒ˜แƒ™แƒ˜แƒก แƒ›แƒแƒ›แƒกแƒแƒฎแƒฃแƒ แƒ”แƒ‘แƒ

Negotiable price
More than 5 years
24/7
Tbilisi
แƒ’แƒ˜แƒแƒ แƒ’แƒ˜ แƒแƒšแƒ‘แƒแƒ แƒแƒจแƒ•แƒ˜แƒšแƒ˜Tbilisi
****************
More than 5 years
24/7
Tbilisi

แƒ›แƒ˜แƒฌแƒ˜แƒก แƒกแƒแƒ›แƒฃแƒจแƒแƒแƒ”แƒ‘แƒ˜แƒก แƒจแƒ”แƒกแƒ แƒฃแƒšแƒ”แƒ‘แƒ แƒฎแƒ”แƒšแƒ˜แƒ—

Negotiable price
More than 5 years
24/7
Tbilisi
********verifiedTbilisi

Frequently Asked Questions - About Drilling and Earthworks

Rotary (Auger) Drilling: Uses a large Archimedes screw (flight auger) and is ideal for soft soil, planting trees in gardens, or installing fence posts at shallow depths. Rotary-Percussive (DTH/Pneumatic) Drilling: Utilizes a powerful air compressor and percussive force. It is indispensable for digging deep water wells because it easily cuts through solid rock formations and granite layers.

After cutting earth or backfilling a trenchโ€”and before asphalt is laid, concrete is poured, or paving stones are setโ€”the soil must be compacted using a specialized vibratory compactor (commonly known as a rammer/jumping jack or plate compactor). If the ground is not properly compacted, it will settle over time, causing the concrete above it to crack or the asphalt to sink.

Excavation/foundation: Calculated by the volume of soil removed โ€” in cubic meters ($m^3$); Trench and channels: Often calculated in linear meters, where the price depends on the depth and width of the channel; Water well drilling: The price is determined by the meters of depth traveled (price per meter), which includes both the drilling process, the installation of service pipes, and flushing the well until clean water flows out.