Apartment, house renovation
Apartment, house renovation service
989 Application
elizbari
More than 5 years
24/7
Tbilisi

แƒกแƒแƒ›แƒจแƒ”แƒœแƒ”แƒ‘แƒšแƒ แƒกแƒแƒ แƒ”แƒ›แƒแƒœแƒขแƒ แƒกแƒแƒ›แƒฃแƒจแƒแƒแƒ”แƒ‘แƒ˜

Negotiable price
More than 5 years
24/7
Tbilisi
elizbariverifiedTbilisi
แƒ’แƒ˜แƒแƒ แƒ’แƒ˜แƒ’แƒ˜แƒแƒ แƒ’แƒ˜แƒ’แƒ˜แƒแƒ แƒ’แƒ˜
More than 5 years
24/7
With Warranty
Tbilisi

แƒ˜แƒแƒขแƒแƒ™แƒ˜แƒก แƒ›แƒแƒฎแƒ•แƒ”แƒฌแƒ "แƒกแƒขแƒ˜แƒแƒจแƒ™แƒ"

Negotiable price
More than 5 years
24/7
With Warranty
Tbilisi
แƒ’แƒ˜แƒแƒ แƒ’แƒ˜verifiedTbilisi
แƒ—แƒ”แƒ›แƒฃแƒ แƒ˜แƒ—แƒ”แƒ›แƒฃแƒ แƒ˜แƒ—แƒ”แƒ›แƒฃแƒ แƒ˜
More than 5 years
Working days, Weekend
With Warranty
Tbilisi

แƒกแƒ แƒฃแƒšแƒ˜ แƒกแƒแƒ แƒ”แƒ›แƒแƒœแƒขแƒ แƒ›แƒแƒ›แƒกแƒแƒฎแƒฃแƒ แƒ”แƒ‘แƒ

150 $ - From/per mยฒ
More than 5 years
Working days, Weekend
With Warranty
Tbilisi
แƒ—แƒ”แƒ›แƒฃแƒ แƒ˜verifiedTbilisi

Tips before starting an apartment or house renovation

1

Complete (capital) renovation

includes updating the apartment from the black frame to a habitable state. This process includes arranging partitions, planning, laying new electrical and plumbing networks, plastering walls, laying floors (styezhka) and final finishing.

2

Cosmetic renovation

The best way to visually update an apartment with a small budget and in a short time. It includes plastering walls, wallpapering or painting, laying laminate and replacing sockets/switches without redoing main communications.

3

European renovation and design project

Premium class service, which is performed according to a detailed 3D design project and engineering drawings. The work uses the highest quality European materials, modern technologies (hidden doors, built-in lighting) and strictly controls the geometric accuracy of lines.

4

Craftsmen's teams vs. construction companies

When starting a renovation, you can hire individual craftsmen (painters, plasterers, electricians) or a whole team under the leadership of a foreman (work producer), which will save you time and ensure the correct sequence of work.

5

Work guarantee and cost estimate

Quality repairs are unthinkable without a pre-written cost estimate (cost estimate) and contract. This protects you from unexpected price increases, determines the exact delivery dates and guarantees the quality of the work.

๐Ÿ’ก

Start the renovation with peace of mind

Find qualified craftsmen, painters, experienced carpenters and workers on the platform: services.ss.ge

แƒ•แƒแƒœแƒแƒ•แƒแƒœแƒแƒ•แƒแƒœแƒ
More than 5 years
24/7
Rustavi

แƒจแƒ˜แƒ“แƒ แƒกแƒแƒ แƒ”แƒ›แƒแƒœแƒขแƒ แƒกแƒแƒ›แƒฃแƒจแƒแƒแƒ”แƒ‘แƒ˜

Negotiable price
More than 5 years
24/7
Rustavi
แƒ•แƒแƒœแƒverifiedRustavi
แƒšแƒแƒจแƒ แƒ•แƒแƒ แƒ“แƒ˜แƒจแƒ•แƒ˜แƒšแƒ˜แƒšแƒแƒจแƒ แƒ•แƒแƒ แƒ“แƒ˜แƒจแƒ•แƒ˜แƒšแƒ˜แƒšแƒแƒจแƒ แƒ•แƒแƒ แƒ“แƒ˜แƒจแƒ•แƒ˜แƒšแƒ˜
More than 5 years
Working days, Weekend
Tbilisi

แƒจแƒ˜แƒ“แƒ แƒกแƒแƒ แƒ”แƒ›แƒแƒœแƒขแƒ แƒกแƒแƒ›แƒฃแƒจแƒแƒแƒ”แƒ‘แƒ˜

Negotiable price
More than 5 years
Working days, Weekend
Tbilisi
แƒšแƒแƒจแƒ แƒ•แƒแƒ แƒ“แƒ˜แƒจแƒ•แƒ˜แƒšแƒ˜verifiedTbilisi
แƒ™แƒแƒ‘แƒแƒ™แƒแƒ‘แƒแƒ™แƒแƒ‘แƒ
More than 5 years
24/7
Tbilisi

แƒกแƒแƒ›แƒฆแƒ”แƒ‘แƒ แƒ - แƒกแƒแƒ›แƒแƒšแƒ˜แƒแƒ แƒ แƒกแƒแƒ›แƒฃแƒจแƒแƒแƒ”แƒ‘แƒ˜

Negotiable price
More than 5 years
24/7
Tbilisi
แƒ™แƒแƒ‘แƒverifiedTbilisi
Brembach-SystemsBrembach-SystemsBrembach-Systems
More than 5 years
24/7
Tbilisi

แƒ”แƒšแƒ”แƒฅแƒขแƒ แƒ˜แƒ™แƒแƒกแƒ˜แƒก แƒ›แƒแƒ›แƒกแƒแƒฎแƒฃแƒ แƒ”แƒ‘แƒ

Negotiable price
More than 5 years
24/7
Tbilisi
Brembach-SystemsverifiedTbilisi
Brembach-Systems
Badri Romashvili
More than 5 years
24/7
Tbilisi

แƒฃแƒœแƒ˜แƒ•แƒ”แƒ แƒกแƒแƒšแƒฃแƒ แƒ˜ แƒฎแƒ”แƒšแƒแƒกแƒแƒœแƒ˜

Negotiable price
More than 5 years
24/7
Tbilisi
Badri RomashviliverifiedTbilisi
แƒ–แƒ•แƒ˜แƒแƒ“แƒ˜แƒ–แƒ•แƒ˜แƒแƒ“แƒ˜แƒ–แƒ•แƒ˜แƒแƒ“แƒ˜
More than 5 years
24/7
Tbilisi

แƒกแƒ แƒฃแƒšแƒ˜ แƒกแƒแƒ แƒ”แƒ›แƒแƒœแƒขแƒ แƒกแƒแƒ›แƒฃแƒจแƒแƒแƒ”แƒ‘แƒ˜

Negotiable price
More than 5 years
24/7
Tbilisi
แƒ–แƒ•แƒ˜แƒแƒ“แƒ˜verifiedTbilisi
แƒšแƒแƒจแƒแƒšแƒแƒจแƒแƒšแƒแƒจแƒ
More than 5 years
24/7
Tbilisi

แƒกแƒแƒ›แƒฆแƒ”แƒ‘แƒ แƒ แƒกแƒแƒ›แƒฃแƒจแƒแƒแƒ”แƒ‘แƒ˜

Negotiable price
More than 5 years
24/7
Tbilisi
แƒšแƒแƒจแƒverifiedTbilisi
natia
More than 5 years
24/7
Tbilisi

แƒ˜แƒœแƒขแƒ”แƒ แƒ˜แƒ”แƒ แƒ˜แƒก แƒ“แƒ˜แƒ–แƒแƒ˜แƒœแƒ”แƒ แƒ˜

Negotiable price
More than 5 years
24/7
Tbilisi
natiaverifiedTbilisi
แƒžแƒ”แƒขแƒ แƒ”
More than 5 years
24/7
Tbilisi

แƒ™แƒ”แƒ“แƒšแƒ˜แƒก แƒฎแƒ•แƒ แƒ”แƒขแƒ, แƒ‘แƒฃแƒ แƒฆแƒ•แƒ

Negotiable price
More than 5 years
24/7
Tbilisi
แƒžแƒ”แƒขแƒ แƒ”verifiedTbilisi
แƒžแƒ”แƒขแƒ แƒ”
Tbilisi

แฒ“แƒ”แƒ–แƒ˜แƒœแƒคแƒ”แƒฅแƒชแƒ˜แƒ+แƒ“แƒ”แƒ–แƒ˜แƒœแƒกแƒ”แƒฅแƒชแƒ˜แƒ

Negotiable price
Tbilisi
qetiverifiedTbilisi
1
...
5051
52
5354
...
77

Frequently Asked Questions - Apartment, House Renovation

The price of apartment renovation is individual and depends on the complexity of the work (cosmetic, European renovation, or complete arrangement of the black frame). The average cost starts from 150 GEL (labor only) and 350 GEL (including materials) per square meter.

The complete (capital) renovation package includes: dismantling of the old coating, installation of partitions, complete installation of electrical wiring and plumbing, plastering and plastering of walls, painting, laying tiles and laminate.

The time frame is directly related to the size of the area and the volume of work. A major renovation of a standard two-room apartment (50-60 sq m) takes an average of 1.5 to 3 months, as certain processes (e.g., plastering, drying) require their own technological time.

Depending on the agreement, both options are possible. The main (black) materials (cement, sand, grout) are often provided by the craftsmen themselves or our company, while the white materials (wallpaper, laminate, chandeliers) are chosen by the customer according to their own taste.

Yes, when working with teams and companies registered on our platform, an official contract is signed, which precisely specifies the repair budget, delivery dates, warranty conditions, and responsibilities of the parties.

Yes, the budget is paid in stages, according to the schedule specified in the contract. As a rule, the amount is divided into 3 or 4 parts, and each subsequent stage is financed only on the basis of the acceptance and delivery act of the previous work performed.